ELDORADO MINE 200KVA TRANSFORMER AND SUBSTATION MATERIAL SUPPLE
2020
CHINHOYI
DESCRIPTION
KACEE supplied WENZHOU ENT (PVT) T/A Eldorado mine Hunyani farm a 200 KVA transformer and substation materials this transaction furtherv demonstrates Kacee’s ability to supply reliable and well trusted electrical equipment to promote an excellent client or supply relationship.
WHITEFIELD FARM 1.7KM 33KV LINE AND 500KVA 33/0.4KV SUBSTATION
2020
MAZOWE
DESCRIPTION
KACEE highly dedicated team successfully completed a 1700m line and 500KVA substation for whitefield farm in Mazowe as a private contractor engaged by ZETDC.
MUFARA MINE 11KV DISTRIBUTION LINE CONSTRUCTION
2021
KWEKWE
DESCRIPTION
The high dedicated KACEE team constructed a 300m of 11KV LINE AND 100kva 11/0.4 substation for new ground mine in Kwekwe. The work was done to ZETDC standard and procedures.
11KV OVERHEAD LINE AND 315KVA 11/0.4KV SUBSTATION
2021
Ramba Nepasi Tynwald
DESCRIPTION
KACEE was constructed by ZETDC to construct a 315 KVA 11/0.4kv substation and 340m 11kv line in Harare.
RUVE GOLD MINE 5500M 11KV LINE 200KVA 11/0.4KV SUBSTATION
2022
GURUVE
DESCRIPTION
- ZETDC STANDARDS AND PROCEDURES
- 5.5KM 11KV LINE
- 200KVA 11/0.4KV SUBSTATION
WUA MINE 1100M 11KV LINE AT 500 KVA SUBSTATION
2022
MUTOKO
DESCRIPTION
KACEE executed a swift and time cautious project for WUA mine in Mutoko.The project installation time was set at 4s working days. Kacee went above and beyond and completeed the project in 40 working days demonstrating the highest dedication to its trade
ECO EQUITY 550M 11KVA LINE AND 500KVA 11/400 SUBSTATION
2022
CHINHOYI
DESCRIPTION
KACEE constructed a 550m 11kv line and 500kva 11/400kv substation at carswall farm in Nyabira for Eco equity.The project was a result of partnership between 2 companies. The project was done as per ZETDC standards and procedures
800m 11kv LINE FOR ARCADIA MINE
2022
GOROMONZI
DESCRIPTION
KACEE electrical contractors was contracted to execute the construction of 11kv distribution line and substation. KACEE provide construction services of 800m 11kv and 1MVA substation at Arcadia mine situated in Goromonzi District
CONSTRUCTION OF 1,2KM 33KV LINE AND 1X1MVA 33/0.4KV SUBSTATION
2022
MAZOWE
DESCRIPTION
KACEE electrical constructed 1.2 km 33KV line and 1×1 MVA 33/0.4KV substation at Mazowe Flowers Milling Plant.
Work was done under supervisionof ZETDC linesman to ensure adherence to safety and recommended standards
MAVAMBO MINING SYNDICATE 500KVA 11/0.4KV TRANSFORMER AND 1000M 11KV LINE
2023
MHANGURA
DESCRIPTION
Mavambo mining syndicate agreed that Kacee will fix and supply 500 kva transformer and construct 1000m 11kv line
DAYLESS SERVICES 500KVA 33/0.4KV SUBSTATION AND 33KV LINE
2023
MAZOWE PRISON
DESCRIPTION
Kacee constructed a 33kv line amd 500 kva 33/0.4kv substation as per ZETDC standard and procedures. The contractor
(Kacee) was engaged by the employer to provide construction services of fix and supply at Mazowe prison situated in Mazowe
LADVILLE INVESTMENTS 8840M 33KV LINE 2000KVA 33/O.4KV SUBSTATION AND AUTORECBSV AND ISOLATOR INSTALLATION
2023
GWERU
DESCRIPTION
Ladville investments contracted KACEE for the construction of 33kV distribution line and substation. Kacee constructed a 8840m 33kV line and 2000 kva 33/0.4 kv substation in Gweru district within 30 working days
LINE CONSTRUCTION AND SUBSTATION AT HELOIS LITHIUM AND MINERAL PROCESSING.
2023
SUSWE, MUDZI
DESCRIPTION
KACEE Electrical Constructed 2.5km 33kv line and 315kv 33/0.4kv substation at our plant in Suswe Mudzi.
4.8km 33KV LINE AND 500KVA TRANSFORMER SUBSTATION CONSTRUCTION.
2023
CHEGUTU
DESCRIPTION
KACEE constructed a 4800m of 33kva line and 500kva Transformer substation to run a crushing plant at Hippo-valley mine located at Chegutu town.
CONSTRUCTION OF 33KV LINE AT CHARANDURA
2024
MASVINGO CHARAMBA
DESCRIPTION
KACEE constructed a 8.5km 33kv Electrical line from Mavhaire Primary to Hama growth point. Kacee demonstrated hardworking and resistance completing the project well withing the project expected copmpletion days.